How Long Does a Kitchen Remodel Take?

A realistic, phase-by-phase timeline so you know what to expect.

A typical kitchen remodel takes about 4 to 8 weeks from demolition to the final walkthrough. Simple updates go faster; a full gut with a new layout takes longer. Here's how the time actually breaks down.

The phases of a kitchen remodel

  • Design & ordering (before work starts) — selecting cabinets, counters, and finishes, then waiting on lead times. This is often the longest part, so we start it early.
  • Demolition (1–3 days) — tearing out the old kitchen.
  • Rough-in (1–2 weeks) — any plumbing, electrical, and framing changes, plus inspections.
  • Cabinets & countertops (1–2 weeks) — cabinets go in, then counters are templated and installed.
  • Finishes (1–2 weeks) — backsplash, flooring, paint, fixtures, and the final details.

What causes delays

The two biggest ones are product lead times (especially custom cabinets and stone countertops) and change orders mid-project. We order materials early and lock down your selections up front to keep things moving on schedule.

Get a timeline for your kitchen

Want a realistic schedule for your specific kitchen? Schedule a free estimate or call (218) 600-8890.

Related questions

How long does a kitchen remodel take?
Most kitchen remodels take about 4 to 8 weeks from demolition to completion. Larger kitchens, layout changes, and long lead times on custom cabinets or stone countertops push it toward the higher end.
What causes kitchen remodel delays?
The most common causes are product lead times — especially custom cabinets and stone countertops — and change orders made mid-project. Ordering early and finalizing selections up front keeps the project on schedule.

Ready to start your project?

Pick a time that works for you. Estimates are always free.

Schedule a Free Estimate